|

|
Penn Station East Coast Subs new location was completed in
December 2011 for franchisee Jim Wilkins. This is the 1st location in the Kansas City market and is located at 8667 W.
135th St, Overland Park, KS.
|
|

|
Kosama Fitness hired CDW to open up multiple location in
the Johnson County market starting in the fall of 2011. Visit http://kansascity.kosama.com/ to learn more about how they can transform your body.
|
|

|
Conference Technologies newest state-of-the-art location
was completed in December 2011 in Overland Park. Visit www.conferencetech.com to learn more about their company.
|
|

|
Continental Business Park- Bldg 3. CDW was hired in the summer
of 2011 to build-out all of the tenant finish for its 27,200 SF office / warehouse building in western Shawnee.
|
|

|
Title Boxing franchisee owner Kelly Hughes hired CDW to build
out their new Title Boxing facility in south Olathe in the winter of 2010.
|
|

|
RPS Properties hired CDW in 2011 for construction management
services for a 4,000 SF building addition to a shopping center in Junction City, KS. It will be the new home of Freedom
Furniture.
|
|

|
Prestige Sports and Fitness hired CDW in October 2010 to
build-out there new fitness center and indoor practice soccer field off of 153rd and Metcalf in Overland Park. Visit www.prestigesportsonline.com
|
|

|
U-Haul Storage in Lenexa, KS- 2002 (*POC)
|
|

|
CDW was excited to be hired by Shari Weyrauch owner of Smart
Cookies Bakery in the summer of 2010 to construct their new bakery- Overland Park, KS. Visit www.SmartCookiesBakery.com
|
|

|
Commercial Office building 'facelift' included stucco work
with corner accents and a new entry awning. Overland Park, KS
|
|

|
Parkway Construction of Dallas, TX hired us to be a
part of their construction project for the new TGI-friday's in Shawnee as well as the re-construction of the Leawood location.
(*POC)
|
|

|
Mid-America Fittings in Shawnee, KS. New front entry along
with parking lot (*POC)
|
|

|
New Balance Shoe Store in Overland Park, KS across from Sprint
Campus (*POC)
|
|

|
Mr. Goodcents Subs & Pastas trusted us for
their tenant finish needs for several locations in the Kansas City area (*POC)
|
|

|
2001 Chucky Cheese remodel in Overland Park, KS. Sub-Contractor
of Parkway Construction in Dallas, TX (*POC)
|
|

|
Digital Connect Store in the KC metro area (*POC)
|
|

|
Breaker's Billards Cafe hired us for their entire construction
process in Shawnee, KS in 2001 (*POC)
|
|

|
North Star Financial Group, Austin TX. Project management
and design work for new office space in 2008.
|
|

|
2nd floor 'Loft' style open office space was created by use
of wood floors, high open vaulted ceilings, several windows and a fireplace to give it a 'warm' feel.
|
|

|
Several Johnson County, KS Great Clips locations were finished
in 2001-2002. (*POC)
|
|

|
Salon Service Group hired us to build out there entire tenant
space for a new retail store in Johnson County (*POC).
|
|

|
Meadowbrook Rehab Hospital in Gardner, KS contracted us to remodel
a wing of the building to include a new nurses station and hallway enhancements (*POC).
|
|

|
The Acupuncture Center of Kansas City used CDW's expertise
in sub-dividing up existing office spaces into individual exam rooms as well as a beautifully renovated entry with hardwood
floors and a fireplace.
|
|

|
Plaza law office complete remodel included wood floors and
carpet, crown molding as well as new doors and window trim (*POC).
|
|

|
Body Coach hired us to construct their entire tenant space
for their new workout center in Overland Park (*POC).
|
|

|
Edward Jones Investments felt confident in using us to
build-out over one hundred (100) offices in and around the Kansas City Metro area. Projects included
architecural drawings, framing, drywall, electrical, plumbing, HVAC, finish carpentry and flooring. (*POC).
|